Engineering Progress Report · June 2026
From Topping-Out to Fine Decoration, Your Home Takes Shape

01

Overall Engineering Progress

🏗️
Civil Works
100% ✓
M&E Installation
30%
🎨
Fine Decoration
10%
02

Civil Works Progress

Site prep, foundation, main structure & plastering complete. Roofing underway.

Site Preparation
Phase 01 100%
Site Preparation & Foundation Engineering
Site leveling, hoarding construction, pit excavation, slope protection, basement slab waterproofing, slab pouring, basement pile cap construction.
Main Structure
Phase 02 100%
Main Structure Engineering
Basement structure, main beams & columns, floor slab casting, roof structure, formwork removal, structural acceptance.
Masonry
Phase 03 100%
Masonry & Secondary Structure
Interior aerated block masonry, exterior wall masonry, construction columns, lintels, window sill caps, door/window opening closure, wall mesh application.
Plastering
Phase 04 95%
Interior & Exterior Plastering
Interior layered plastering, exterior anti-crack plastering, corner alignment, whole-house repair leveling, screw hole sealing.
Roof
Phase 05 50%
Roof Engineering
Roof slope grading, roof waterproofing, protective layer construction, roof insulation, detailed treatment of roof edges.
03

M&E Installation Progress

Plumbing and electrical installations in various stages across floors

Plumbing
Phase 01 50%
Plumbing & Drainage Installation
Water supply pipe pre-embedding, drain pipe reserves, bathroom riser installation, balcony drainage, roof drainage, whole-house water pressure testing.
Electrical
Phase 02 10%
Strong & Weak Current Electrical
Strong electricity box pre-embedding, weak current box pre-embedding, whole-house cable wiring, public shaft wiring, bridge installation, whole-house power debugging.
04

Fine Decoration Progress

Fine decoration unit entered Jan 2026, current progress

Decoration Handover
Phase 01 15%
Decoration Handover
Civil works handover, wall/floor hollow repair, measured acceptance review, precise decoration layout, whole-house leveling verification.
Plumbing Upgrade
Phase 02 50%
Plumbing & Electrical Upgrade
Decorative point review, wall trench fine-tuning, whole-house line replacement upgrade, bathroom/kitchen water optimization, precise point relocation.
Waterproofing
Phase 03 7%
Bathroom & Kitchen Waterproofing
Fine leveling of bathroom/kitchen base, multi-layer wall waterproof coating, thickened ground waterproofing, 48-hour closed water test, acceptance and protection.
Central AC
Phase 04 10%
Central Air Conditioning
AC indoor unit hanging and fixing, copper pipe laying and connection, thermal insulation wrap, condensate water pipe layout, vent reservation, unit debugging.
Ceiling
Phase 05 10%
Whole-House Ceiling Base
Living/dining room keel ceiling, bedroom flat ceiling, curtain box custom making, corridor ceiling, whole-house crack prevention treatment.
Tiling
Phase 06 5%
Wall & Floor Tiling
Bathroom/kitchen wall tiles, bathroom/kitchen floor tiles, balcony floor tiles, threshold stone installation, drain slope precision, grouting base prep.
Floor Leveling
Phase 07 10%
Floor Leveling & Wood Flooring Base
Whole-house floor precision leveling, ground moisture proofing, wood flooring base polishing, base leveling acceptance.
05

Full-House Brand Configuration

First-tier brands, no compromises

Civil Works Brands
Mitsubishi Elevator
Building Passenger Elevator
Global century-old high-end elevator brand
Sino-Japanese Joint Venture
Xinyi Glass
Double Low-E Insulated Glass
China's largest glass manufacturer
Hong Kong Stock Listed
Kinlong Hardware
Door & Window Hardware
China's listed building hardware leader
A-Share Listed
SKSHU Paint
Exterior Wall Coating
China's listed eco-friendly coating leader
A-Share Listed
Kesun Waterproof
Full-House Waterproofing
China's listed waterproofing head brand
A-Share Listed
Hikvision
Smart Security Monitoring
Global security industry leader
Global Leader
Fenglu Aluminum
Door & Window Aluminum
China Aerospace special aluminum
Aerospace Grade
Fine Decoration Brands
Nippon Paint
Interior Wall Latex Paint
Global renowned coating brand
Global Brand
Midea AC
Central Air Conditioning
Fortune 500 home appliance brand
Fortune 500
OPPLE Lighting
Downlights & Panel Lights
China's listed lighting leader
A-Share Listed
Lesso
PP-R Water Pipes
China's listed pipeline leader
Hong Kong Listed
Jujia (Gold Medal)
Cabinets & Wardrobes
A-share listed subsidiary
A-Share Subsidiary
Lens Shower
Shower Enclosures
Industry standard drafter
Industry Standard
Huida Sanitary
Ceramic Basin & Vanity
Olympic supplier
Olympic Partner
AUPU Ceiling
Integrated Ceiling
Industry founder
Industry Founder
Taishan Gypsum
Ceiling & Wall Board
State-owned enterprise
State-Owned
Opgeya Flooring
Wood Flooring
Oppein sub-brand
Oppein Sub-Brand
NewEnergy
Air Source Heat Pump
Air energy head brand
Head Brand
Sifeiao
Shower & Faucets
Professional sanitary hardware
Professional
EGEROND
Switches & Sockets
British standard premium
Premium
06

Construction Site Gallery

86 real on-site photos · June 17-30, 2026